Almost everything written about this says your drawing was incomplete, and it is usually written by somebody who sells drawings. That is half the answer. The other half is that a drawing is rejected against a rule — and the rule is the part people get wrong before they draw anything.
The short version
Fence height advice is written nationally — “about four feet in front, six in the back” — and permits are issued locally. Of the 55US cities whose fence ordinances we have encoded from each city's own municipal code, 44 state a rear-yard limit and 12 of them are not 6 feet. A fence drawn to the number from the wrong city is complete, accurate, to scale, and rejected.
Then there is the structural problem underneath it. Of those same 55 ordinances, 5 mention a drawing at all and 1 ties one to the fence permit submittal. The code tells you the rule. Something else — a counter handout, a checklist, a phone call — tells you how to prove it, and applicants routinely never see that second document.
The number everyone repeats, against 44 cities that wrote their own
32 of the 44 cities here that state a rear-yard cap do allow 6 feet, so the national guide is right more often than not. These are the 12 where it is wrong — in both directions, which is the part that costs money either way.
| City | Rear-yard cap | Versus the guide |
|---|---|---|
| Grosse Pointe Shores, MI | 4' | Stricter — a 6' fence here is a rejection |
| Grosse Pointe Woods, MI | 4' | Stricter — a 6' fence here is a rejection |
| St. Clair Shores, MI | 6'6" | More generous — you may build taller than you thought |
| Chandler, AZ | 7' | More generous — you may build taller than you thought |
| Greensboro, NC | 7' | More generous — you may build taller than you thought |
| Ann Arbor, MI | 8' | More generous — you may build taller than you thought |
| Durham, NC | 8' | More generous — you may build taller than you thought |
| Gilbert, AZ | 8' | More generous — you may build taller than you thought |
| Jacksonville, FL | 8' | More generous — you may build taller than you thought |
| Raleigh, NC | 8' | More generous — you may build taller than you thought |
| Scottsdale, AZ | 8' | More generous — you may build taller than you thought |
| Tempe, AZ | 8' | More generous — you may build taller than you thought |
2 of them cap the back garden at 4' and then sell the rest back to you for a signature: you may build to 6'with the adjoining owner's written consent submitted with the application. That is not a drawing problem, and no site-plan service will catch it for you.
The front yard is worse
28 of these 55 cities state a front-yard cap, and between them they use 7 different numbers running from 2'6" to 6'. Of the 26 cities that state both a front and a rear limit, 25 use different numbers for the two.
| Front-yard cap | Cities | Which |
|---|---|---|
| 2'6" | 1 | Grosse Pointe Woods, MI |
| 3' | 6 | Chandler, AZ, Glendale, AZ, Goodyear, AZ, Grosse Pointe, MI, Harper Woods, MI, Tampa, FL |
| 3'4" | 1 | Phoenix, AZ |
| 3'6" | 4 | Avondale, AZ, Buckeye, AZ, Mercer Island, WA, Seminole, FL |
| 4' | 14 | Ann Arbor, MI, Clearwater, FL, Durham, NC, Greensboro, NC, Grosse Pointe Farms, MI, Jacksonville, FL, Largo, FL, Orlando, FL, Raleigh, NC, Royal Oak, MI, Seattle, WA, St. Petersburg, FL, Tarpon Springs, FL, Tempe, AZ |
| 4'6" | 1 | Bellevue, WA |
| 6' | 1 | Federal Way, WA |
The two ends of that spread are worth reading in the cities' own words, because neither is reachable from a national average.
What the reviewer is checking that only the drawing can settle
Height is a number you can be told over the phone. These are the rules that need a scaled plan, because they are about where things sit relative to each other. Each count is how many of the 55 encoded ordinances carry that kind of provision.
Does the ordinance tell you what to draw? Almost never
We searched all 55 encoded ordinances for any mention of a site plan, a plot plan or a scaled drawing. 5 cities use one of those phrases, and reading them in context is more instructive than the count:
The other 50say nothing about the drawing at all. They are not being careless — submittal requirements normally live in the building department's own application packet, which is a different document in a different place, often not in the code and sometimes not on the website. So the single most useful thing you can do before drawing anything is ring your building department and ask for the fence permit packet.
What these counts are, and what they are not
These 55 cities were chosen because their counties publish parcel data we can use, not at random — they sit in 5states, and there are roughly 19,500 incorporated places in the US. The rules were transcribed to drive height, setback and material checks, so a submittal requirement written elsewhere in a city's code, or in a counter handout that is not code at all, can be absent from this sample. Read these numbers as a map of how much cities differ, which is what they are good for, and your own city's fence handout as the answer that binds you.
Getting it right the first time
Questions people actually ask
- Why do fence permits get rejected?
- Because the drawing does not prove compliance with a rule, and usually because the applicant had the wrong rule in mind before they drew anything. Fence height is the clearest case: of the 55 US cities whose fence ordinances are encoded on this site from each city's own municipal code, 44 state a rear-yard cap, and 12 of those 44 are not the 6 feet that nationally-written fence guides quote. A drawing built to a number from the wrong city is complete, accurate and still rejected.
- Is a 6-foot back garden fence allowed everywhere?
- No. Across the 44 cities here that state a rear-yard limit, 32 allow 6 feet and 12 do not — the stated values run from 4' to 8'. Some of those cities are stricter than the guide and some are more generous, so the guide costs you a rejection in one direction and a shorter fence than you were entitled to in the other. Read your own city's code.
- What about the front yard?
- The front-yard cap is where the variation is worst. 28 of these 55 cities state one and they use 7 different numbers, from 2'6" to 6'. Of the 26 cities that state both a front and a rear limit, 25 use different numbers for the two, so "how tall may my fence be" has no single answer even inside one city.
- Does my city's fence ordinance tell me what to draw?
- Probably not, and that is the structural problem. Of the 55 ordinances encoded here, 5 mention a drawing at all and only 1 — Tarpon Springs, Florida — ties one to the fence permit submittal. The rules live in the code and the drawing requirements, where they are written down at all, live in a counter handout or a checklist on the department's website. Ask your building department for the fence packet before you draw, not after.
- What has to be on the site plan itself?
- A scaled, dimensioned plot plan: your lot with its boundaries, the buildings already on it, the proposed fence with its lengths, height, material and gate widths, the distance from the fence to each boundary, a stated scale and a north arrow. Existing fence that is staying should be drawn separately from what you are adding. Anything geometric that your code mentions — a corner sight triangle, an easement — has to be visible on the sheet, because the reviewer has no other way to check it.
- Can I draw it myself, or do I have to pay someone?
- You can draw it yourself. Fence Plotter produces the plot plan free, on a satellite image of your own address, using the county's parcel outline where we have it — and for the cities whose ordinances are encoded here it also checks the fence you drew against that city's own height and setback numbers before you print. It is a permit drawing, not a land survey, and it says so on the sheet.
Start with your address. If your county is covered, the real lot lines come up on their own — and the fence you draw is checked against your city's numbers before you print.
Draw my site plan →Fence Plotter prepares the drawings your application asks for. It is not a land survey, it does not file anything and it does not approve anything — confirm height, setback, material and submittal requirements with your building department before you build. Are you a building department? This tool can live on your own permit page.